Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9067244
- Product Categories
- Friendly Links
Information Name: | Supply of ore Malisan lowest price election FUTONG 18,653,879,329 |
Published: | 2012-08-13 |
Validity: | 1000 |
Specifications: | Conference call |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Mine Malisan Mining Malisan Chemical Malisan sealing Malisan, bottled Malisan Malisan role Malisan in the coal mine, Malisan advantage Malisan development A high degree of finished products Malisan belong to the polymer reactive materials, this product is 25-30 kg plastic barrel packing, transportation, open the can be used to facilitate construction. 2 traffic, the economic effect Easy transportation of equipment and raw materials, once in place, does not require specialized equipment and the laying of pipelines. 3, the Four Seasons construction, non-polluting Malisan construction site requirements, as long as the wind source to the material after the reaction, to generate an inert foam. 4, at a reasonable cost Malisan high expansion, a small amount of maximum effect, so the economic costs and reasonable. 5, long-lived, short duration Malisan has good compressive strength, and can withstand the movement of the strata, with long-lived; Malisan rapid response, shorten the construction period, save time, does not affect the production to ensure the production of coal mine safety progress. 6, construction equipment, easy operation The product need only a dedicated pump and a mixing gun, the construction process is simple, and now the construction process as outlined below: (1) hole design: (2) drilling, requirements of the drilling diameter Ф = 42mm, depth, inclination scene. (3) and multi-function pump and its attachment assembly secure the injection gun. (4) grouting, two suction tubes were inserted into the barrel of resin and catalyst Malisan the movement of the piston under the action of the gas motor, due to the effects of stress so that the raw materials after the piston into the conveying pipe, conveying to the injection gun into the formation through the injection gun, raw materials penetrate the cracks, and then rapid response to reach the purpose of reinforcement. (5) stop the grouting, piping and mixed with resin wash gun. (6) exchange hole grouting, repeat 2 to 5 steps. (7) after the grouting is completed, the cleaning agent multi-function pump and accessories. The construction process is simple, easy to operate on-site construction do not ask, can quickly and efficiently achieve the purpose of plugging. Technical advantages (1) low viscosity to penetrate the small cracks; (2) excellent adhesion and strata formation of strong adhesive; (3) its good flexibility properties to withstand the subsequent movement of strata; (4), fast response, within ten seconds after the water of reaction can quickly block the flow; Bubble formation in the reaction (5) is not soluble in water; (6) a good compression performance; (7) high expansion rate, to achieve the original volume of 20 - 25 times the amount of small construction and save money. Contact: Li Xudong, Mobile: 18653879329 Plane :0538-8712382 QQ: 1812568726 |
Admin>>>
You are the 9246 visitor
Copyright © GuangDong ICP No. 10089450, Tai'an City Fu mine fill material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 9246 visitor
Copyright © GuangDong ICP No. 10089450, Tai'an City Fu mine fill material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility